Shelby to Cut Bank Waterline and New Booster Station. Geotechnical evaluation for several structures, including a pump station, standpipe, meter vault, and stream crossings, as well as a new 18-inch diameter PVC water line.
SK Geotechnical performed lab and field QC testing for this four-story retirement housing complex in Billings' West End. From subgrade observations, through concrete, compaction, anchors, and shear walls, to final parking lot base and paving, we were able to deliver timely and accurate construction testing with on-site reports and…
Internationally recognized contractor DN tanks entrusted SK Geotechnical with the two latest tank additions in Billings. With their state-of-the-art pre-tensioned concrete composite construction, typically involving at least four different mix designs, DN Tank builds above and below ground water storage tanks that are designed to last through generations. In…
Geotechnical evaluation and construction materials testing for three separate buildings across the development: a main building, an unheated vehicle and material storage building, and a controlled waste facility building.
This project consisted of the design and construction of three bridge replacements and four seismic retrofits for seven separate structures along Interstate 90 in north Bozeman, Montana.
Bridge Replacement
North 7th Avenue Interchange
Eastbound and Westbound P-86/Montana Rail Link Structure
Eastbound and Westbound Montana Rail Link Spur Line Structure
Seismic Retrofits
Eastbound and Westbound Valley…